Customization: | Available |
---|---|
After-sales Service: | Timely,Sufficient and Reliable |
Warranty: | Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Main indicators and parameters of the equipment | |
Sagger processing capacity | 30~60 Split/Car |
collocation method | One to one, one to two |
Furnace entry method | Kiln cart bowl arrangement: 6 rows and 5 columns |
Sagger bowl specifications | Φ450 ×1000~1200 |
Loading parameters | 60kg~80kg |
major equipment | Automatic suction and unloading station, automatic loading station, manual auxiliary unloading station, manual auxiliary loading station, automatic lid opening and closing station, cooling system, material caching system, etc. |
Q1: What is the lead time for mass production?
A1: It depends on the order quantity and the season you place your order. The lead time of MOQ is about 90 to 120 days